Performance Measures & Results 

-

 

Reduce electrical consumption by 10 percent over a five year period ending in October 2016 - at 
the Central Wastewater Treatment Plant ( 150 mgd peak flow secondary treatment plant) 

 

-

 

The Utility exceeded this performance goal in the third year of the five-year performance 
measurement period by reducing overall electrical consumption by 14.5 percent.  It important 
to note that this reduction of electrical consumption is based on kW per million gallons treated; 
therefore it factors in seasonal changing of wastewater volumes treated.