523 

 

VCS is collaborating with WERF in an international study aimed at process intensification through the 
inducement of granulation of the biomass in its BNR reactors. The hydrocyclones that make part of the 
mainstream deammonification capabilities assist in keeping heavier biomass fractions within the 
process, while wasting lighter fractions. Results to date are very encouraging, showing significant 
improvement in biomass settling characteristics 

VCS is in the process of retrofitting the oxidation ditch of another of its smaller BNR facilities to be able 
to optimize oxygen transfer by combining fine bubble membrane panels, surface aerators and slow 
speed horizontal mixers. If successful, this system will be retrofitted into the larger Ejby Mølle facility. 

Performance Measures & Results 

Your Performance Measure(s) 

Your Results (quantitative or qualitative) 

Achieve corporate goal of energy self-
sufficiency by 2014 

The Ejby Mølle WWTP achieved energy-neutrality by end of 2013 
by leveraging carbon redirection in order to reduce process energy 
consumption while increasing energy generation from a biogas 
driven combine heat power system. 

Further improve energy profile 

The Ejby Mølle WWTP is currently generating over 150% of its 
energy demand as the result of adopting sidestream and 
mainstream deammonification capabilities. 

Process Intensification 

Inducement of biomass granulation through the use of 
hydrocyclones has improved sludge settleability, as measured by 
the reduction of average sludge volume index values in excess of 
40%. This will further increase the energy efficiency of the facility 
by reducing facility and operational requirements of nutrient 
removal. 

Be recognized for contribution to the water 
industry’s knowledge base  

Energy optimization efforts were recognized by receiving the WEX 
Process Optimization award during the 2013 Water and Energy 
Exchange conference in Madrid (Spain).